The final two frames were the bulkhead frames D’ and S.
Frame D’
Frame D’ includes one of the keel timber’s and the mast support. These frames were built the same as the previous frames. I did move these outside to give me more access to my workshop which was lost under the table.
Initial setup
Final setup
Glued
Frame S
Frame S was glued in 2 stages as it was double sided
Frame S glue up 1
Frame S glue up 2
That’s the end of the initial frame build
Comments