

Finishing the frames
Before mounting the frames on the hull jig I spent the time to fillet the internal corners and fill the screw heads with West System...
Apr 16, 20241 min read
Â
Â
Â


Building Frames Part 3
The final two frames were the bulkhead frames D’ and S. Frame D’ Frame D’ includes one of the keel timber’s and the mast support. These...
Apr 11, 20241 min read
Â
Â
Â


Laminating Timbers
Denman Marine supplied the material for the keel timbers and mast supports. The oak was supplied in 10mm strips which I laminated with...
Apr 10, 20241 min read
Â
Â
Â


Building Frames Part 2
Frame B The next frame constructed was Frame B. Frame B was relatively simple and I didn’t take many photos. Frame B assembled Frame C...
Apr 9, 20241 min read
Â
Â
Â


Building Frames
During 2023 I built the frames for the boat. I started by cutting all the CNC part out of the ply and timber and cleaning the tabs off on...
Apr 9, 20241 min read
Â
Â
Â


Kit Delivery
Hi I'm Josh, I purchased plans for Class Globe 5.80 Hull 177 in early 2022 and waited for almost a year (and moved to a house with more...
Mar 31, 20241 min read
Â
Â
Â